Project Description:
• The City plans to solve the transportation issues accessing the City Center. This plan eliminates critical safety
issues, increases mobility, and allows the planned economic development of the City Center as designated by
the Metropolitan Planning Organization (MPO). The project provides improvements that will modify the existing
interchange of S 320th Street at Interstate 5 (1 -5) in multiple phases, with the southbound off -ramp improvements
already constructed. The project will not only benefit the designated urban center city core, but will address state
and federal highway system issues in this vicinity. The S 320m St at 1 -5 interchange is the sole freeway access
to the City Center and the project is within the U.S. Department of Transportation's Six Interstate Routes
"Corridors of the Future" to Help Fight Traffic Congestion on Interstate 5.
Project Purpose and Need:
In order to enhance access to and circulation within the City Center, the City of Federal Way seeks to improve safety
and reduce congestion on the transportation network with the following:
• Mitigate high collision rates by correcting deficiencies in the existing interchange ramps. Additionally, alleviate
existing and future year congestion while providing safety mitigation at S 320th Street and Interstate 5.
• Increase and distribute vehicle capacity in the local and highway system with additional combined access to
Interstate 5 and new east -west regional arterial connectivity.
Project Benefits that will meet these community needs:
• Reduce exceedingly long delays due to volumes of vehicles, freight, and buses by reducing congestion that
occurs morning, midday and evening peak hours, as well as several hours during weekends.
• Increased mobility in access to the city with this project supports economic development and livability of Federal
Way's City Center Core, a designated Urban Center.
• The project is within the Highest Accident Corridors and Highest Accident Locations in the State. Many collisions
are due to incident - related congestion resulting from spillover traffic impacts at this project location from the
southbound ramp. A substantial decrease of collisions will occur by the project providing relief to the existing
interchange.
Project Schedule:
Phase 1 — Feasibility Study 2003 to 2005 COMPLETE
Phase 2 — Environmental Assessment & Preliminary Engineering 2007 — 2009 TO BE RESUMED IN 2017
Phase 3 — Constructed turning lane improvements to the 1 -5 southbound ramp 2010 COMPLETE
Phase 4 — Resume Environmental Assessment & Preliminary Engineering FUNDING REQUEST
Phases 5 to 11 — Construct subsequent phases 2019 thru 2030
Contact Information:
Marwan Salloum, P.E.
Public Works Director
253.835.2720
Rick Perez, P.E.
City Traffic Engineer
253.835.2740
Project Partners and Cost Information:
The City is pursuing funding for Phase 4 of $1.0 million with City funding of $1.5 million for a total of $2.5 million, in
order to complete the environmental documentation, preliminary engineering, and Interchange Justification Report.
Future phases of the total project are estimated to cost up to $280 million with future funding to be programmed.
FHWA, WSDOT, King County, PSRC, and the City of Federal Way partnered on all phases. City funds for Phase 1,
2, and 3 of the project equal a $5.325 million match and includes matching funds through developer traffic mitigation.
C: \Users\marwans\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook\ARW8J33Z\Updated CC Access briefmg 2016 -12 -07 (4).doc
CITY OF
Federal Y CITY CENTER ACCESS PROJECT
PRIMARY FEATURES
• Modify freeway ramps from South
320th Street to South 324th Street
IMPROVEMENTS
• Provides traffic relief at South
320th Street
• Disperses traffic more evenly
PROGRAMMED PROJECTS*
O Widen South 320th southbound
off -ramp
O Widen South 320th Street overpass
O Relocate northbound on- and off -
ramps at 320th Street
0 Add new overpass at South 312th
Street
O New roadway extension at 32nd
Avenue South
O Extend South 312th Street to Military
Road
ALTERNATIVE 2 ELEMENTS
0 Modified intersection
O New roadway
O New overpass
0 Modify on -ramps from S. 320th
and South 324th Street
• Modify off -ramps to S. 320th and
South 324th Street
• Programmed projects have been identified in
prior King County and/or City of Federal Way
Transportation improvement Plans.
•T• Washington State US. Deportment of TrcneportaIlon
i o.�.tin.at of Highway Actilnlitrafbn
C:\ Users \marwans\AppData \Local\Microsoft \Windows \Temporary Internet Files\ Content .Outlook\ARW8J33Z\Updated CC Access briefing 2016 -12 -07 (4).doc