HomeMy WebLinkAbout23-104083City of Federal Way
FILE
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Electrical
Permit #:23-104083-00-EL
Inspection Request Line: (253) 835-3050
Project Name: FAIRWAY 7 TERRACE CONDOMINIUMS; Unit B-8
Project Address: 2814 SW 327TH ST
Project Description: Replacing a Zinsco NILO panel with a new 125A NIB panel.
Parcel Number: 246950 0080
Owner Applicant Contractor
STEVEN SADENWASSER TAYLOR NANCEMAUNA ELECTRIC LLC MAUNA ELECTRIC LLC
2814 SW 327TH ST UNIT B-8 17810 110TH STREET CT E MAUNAEL809CJ (2/11/24)
FEDERAL WAY WA 98023 BONNEY LAKE WA 98391 17810 110TH ST CT E
BONNEY LAKE WA 98391
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1
PERMIT EXPIRES Tuesday, 6 February, 2024
Permit Issued on Thursday, August 10, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the wi, be in accordance with the laws, rules and regulations of the State of
i �n E
Federal Way.
Owner or agent:
Date:
CITY nr
Federal Way
THIS CARD IS TO REM_2I1 ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (21-53) 83-5-3050
Scheduled inspections nix: be failed if this card is not on -site. DO NOT LOSE TEES CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom), Please schedule inspections as appropriate. Work must not be covered until it is approved. Check -with your inspector if
you are unsure about am of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
Q
By
LIFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
0
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
❑
Temporary Poker (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
FeederslSab panels (404�
❑
Rough Electrical (4225)
®
Ceiling Cover (4020)
Approved
Approved
Approved
Bp
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
'Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑3
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑ Plumbing Groundwork (4190)
❑ Rough Plumbing (4230)
❑ Final - Plumbing (4075)
Approved to cover
Approwd
Approved
By Date
By Date
Bi- Date