Loading...
HomeMy WebLinkAbout23-102277Mechanical Cityof Federal yDevelopment Permit #:23-102277-00-ME Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ST FRANCIS HOSPITAL - MRI Project Address: 34515 9TH AVE S Parcel Number: 750451 0020 Project Description: BLUEBEAM - Install inline exhaust fan above ceiling, exhaust duct, grilles, roof cap. Owner Applicant Contractor COMMON SPIRIT HEALTH AMANDA MOOREMACDONALD MILLER MACDONALD MILLER FAC SOL INC 34515 9TH AVE S FACILITY SOLUTIONS INC (GENERAL) FEDERAL WAY WA 98003 PO BOX 47983 MACDOFS8080S (8/27/24) SEATTLE WA 98146 PO BOX 47983 SEATTLE WA 98146 Additional Permit Information Mechanical Work Valuation?............... ................. 12000 Is this an Online or O.T.C. application?.................. No Mechanical Fixtures Ducting 1 Fans I PERMIT EXPIRES Saturday, 2 December, 2023 Permit Issued on Monday, June 5, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash t&n ang4he City of Federal Way. Owner or agent: FrL V7 Date: CITY of Federal Way PERMIT #: 23 102277 00 THIS CARD IS TO REMAIN ON -SITE, Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 34515 9TH AVE S Project: COMMON SPIRIT HEALTH FEDERAL WAY WA 98003-6761 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Mechanical Rough -in (4165) Q Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved Date By Date 41t Ls By Date By Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date r `m �c fl: Ift r: <=MacDonald -Miller FAGIIJTY SOLUTIONS We make buildings work better. TEST, ADJUST, & BALANCE REPORT FOR ST. FRANCIS MRI EXHAUST JOB # 7723-2129 34515 9T" AVE S FEDERAL WAY, WA 98003 THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH TABB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED TABB TOLERANCES, ARE NOTED THROUGHOUT THIS REPORT. Report Date: May, 18th 2023 Field Technician: Elise Fowler Supervisor. Oleg Stepanyuk macmiller.com 1-840-957-5979 WASHINGTON & OREGON TEST, ADJUST. & BALANCE REPORT S T FRA Ncis MR1 EXHAus 7' JOB # 7723-2129 Federal Way, WA MacDonald -Miller FACILITY SOLUTIONS We make buildings work better. TEST. ADJUST, & BALANCE REPORT 1) General Notes a) HVAC Work completed 5/18/2023. b) All measurements taken according to TABB procedural standards. c) Design information obtained from drawings and submittals provided. d) Volumetric airflow readings taken with a calibrated Testo 420 Flowhood and Shortridge ADM. 2) Scope of work a) Test, adjust, and balance one (1) newly installed EF serving MRI room. b) Survey existing airflow from VAV-D / FCU-6. i) FCU is back up and not normally operational. Did not test. 3) Findings a) MRI-EF i) Inlet 2 total was obtained via subtracting Inlet 1 from traverse total. ii) Fan set to low speed b) VAV-D / FCU-6 i) Combined units. FCU powers on in event of AHU failure to maintain airflow to space. ii) Newly installed Bulimo actuator on FCU-6 not powered on due to delayed arrival of transformer. (1) Unable to proportion outlets as a result, reflecting in Outlet 1 at 108% and Outlet 2 at 56%. iii) Unit(s) are low on airflow with total being at 89%. macmiller.com 1-800-962-5979 WASHINGTON & OREGON ! lTEST, ADJUST. & BALANCE REPORT ST FRANCIS MR1 EXHAUST JOB # 7723-2.129 Federal Way, WA ABBREVIATIONS MacDonald -Miller FACILITY SOLUTIONS We make buildings work better. AC AIR CONDITIONING UNIT HP HORSEPOWER BDD BACK DRAFT DAMPER HP HEAT PUMP AIR CONDITIONING UNIT BHP BRAKE HORSEPOWER HWR HEATING WATER RETURN B.S. BIRD SCREEN HWS HEATING WATER SUPPLY CEG CEILING EXHUAST GRILLE INAC INACCESSIBLE CRG CEILING RETURN GRILLE LAT (DB) LEAVING AIR TEMP. (DRY BULB) CFM CUBIC FEET PER MINUTE LAT (WB) LEAVING AIR TEMP. (WET BULB) CHWR CHILLED WATER RETURN LD LINEAR DIFFUSER CHWS CHILLED WATER SUPPLY LWT LEAVING WATER TEMPERATURE CSD CEILING SUPPLY DIFFUSER MAX MAXIMUM CWR CONDENSER WATER RETURN MIN MINIMUM CWS CONDENSER WATER SUPPLY O WIDE OPEN DAMPER / AIR PATH DD DIRECT DRIVE OBD OPPOSED BLADE DAMPER DP DIFFERENTIAL PRESSURE OD OUTSIDE DIAMETER DIFF DIFFUSER OSA OUTSIDE AIR DMPR DAMPER RA RETURN AIR DNA DATA NOT AVAILABLE REQ'D REQUIRED DNL DATA NOT LISTED RH RELATIVE HUMIDITY DNT DATA NOT TAKEN RTU ROOFTOP UNIT DWDI DOUBLE WIDTH DOUBLE INLET SA SUPPLY AIR EAT (DB) ENTERING AIR TEMP. (DRY BULB) SP STATIC PRESSURE EAT (WB) ENTERING AIR TEMP. (WET BULB) SWG SIDE WALL GRILLE EC EGGCRATE RETURN SWR ASIDE WALL REGISTER EF EXHAUST FAN SWSI SINGLE WIDTH SINGLE INLET EG EXHAUST GRILLE T OUTLET NEAREST THERMOSTAT ESP EXTERNAL STATIC PRESSURE TSP TOTAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE T.P. THERMALLY PROTECTED FPM FEET PER MINUTE T-STAT THERMOSTAT OR SENSOR FH FUME HOOD TYP TYPICAL GPM GALLONS PER MINUTE 0 VOLTAGE PHASE / DUCT DIAMETER HF HEPA FILTER V.D. VOLUME DAMPER macmiller.com 1-800-962-5979 WASHINGTON & OREGON 9 •"��-TEST, Ab:JUST, 8� --LANCE REPORT �i ST FRANCts MR1 ExNAUST l 23-2129 Eral Way,. WA 4=)MacDonald -Miller FACILITY SOLUTIONS MacDonald -Miller F We make buildings work better. 1 N.9 B Instrumnt Calibration lnstrument Function Minimum Ran a Minimum Aocurac Minimum Resolution Instrument Information Cali:braflon Date Rotational Measurement Tachometer 60-5000 t2% of Read RPM t2 RPM 1 RPM Extecll - 461995 10/28rr2021 �341111 Temperature Measurement Thermometer On to 200OF of ReadrRg o 2 0°F 0.1°F Fluke 525eries II 10/12/2021 26090483W''S Air Probe Fluke 80PK-SA ID/12/2021 NA Immersion Probe Fluke 80PK-5A 10{12/2021 NA Contact Probe OMEGA 792 10/12/2021 Electrical Measurement Volts 1- 600 VAC ±2% of Reading air ±5 Digits 1 Volt Fluke 378 FC 1011512021 545300r14 Amperes 0.1- 100 Amps 0.1 Am eS Fluke 378 FC 1Q/15/2021 54530914 Air Pressure & Velot Air Pressure to 10-0 in W.q. +2%or read to,001" WR 10.01'bog '1 " WE Shor-trldge 860C 4/28/2022 M13055 Air Velocity Pitot Tube SO to 3500 FPM ±5% of read ±7FPM l.a F PM Shortrldte 860C 412$r2az2 M13055 Air Velocity 50t06000 FPM ±3%ofread ±3 FPM 1.0FPM TS19545-A 9/22/2021 954SA1904010 Air Velocity RVA 50to 6000 FPM ±1%of read ±4FPM 1,0 FPM TSI 5725 9122f 2p21 T57251942002 Humidity Measurement Humidity 10toH ±3%RH 1-0�£ 9/22f2021 95451A195-A Hy dronic Measurement Hyrdronic Differential 0.4 to 200 PSI ±2% or read 1 PSI 0.1 PSI ALNOR HME85 q/6/2022 72203018 macmiller.com 1-800-962-5979 WASHINGTON & OREGON 4=% MacDonald -Miller FACILITY SOLUTIONS Project Location Altitude Density St Francis MRI Exhaust Above Men's Restroom Sea Level Standard 11 Pitot Tube Job Number System/Service Air Temperature Correction Factor Rectangular Duct Traverse Report 77232129 MRI-EF 70 1.0 Test Data Required I Actual Width 14 Height 14 Duct Area 1.361 Static Pressure 0.068 Total FPM 14106 1 15558 No. of Points 16 Average FPM 882 972 CFM 1200 1324 Remarks: Fan set to low speed (1 V). Test Date 18-May Readings By E. Fowler <=�MacDonald -Miller FACILITY SOLUTIONS Project Job Number Area Served MRI-EF St Francis MRI Exhaust 77232129 System Air Outlet Test Report Exhaust Outlet I Design I Preliminary Final Percent of No. I Type I Size Ak Vel. I Flow I Vel. Flow Vel. Flow Design MRI Ill EG 124x241 1 1 1 900 1 1 746 1 1 990 1 110% MRI 1 1 2 1 EG I 18x10 1 1 1 1 300 1 1 500 1 1 330 1 110% Totals 1200 Remarks: Inlet 2 total obtained by taking traverse of EA duct and subtracting inlet 1 total. Fan at 1 V 1246 1320 110% Test Date: 5/18/2023 Readings By: EF VAV-D MRI 1 LCD 16x8 1 320 345 345 108% Control Room 1 1 2 CD 6 1 180 100 100 56% Remarks Totals 500 Unable to proportion as Bulimo actuator on outlet 1 (back up fan coil) is not powered. 445 445 89% Test Date: 5/18/2023 Readings By: EF Test Date 5/18/2023 Readings By E. Fowler 'D + �J€jl 1�'� l7 �I 1 � � g Y r �'; Q Y �C� � � � Y� Y � A �. 0 L� 2 Ag 0 q; If I 6 m I .-A I 21 !vn q ON ni"P, 4 u 01 og H Ll ST FRANCIS MRI EXHAUST FAN VIRGINIA MASON FRANCISCAN HEALTH MacDonald -Miller C) 7s ISSUED FOR PERMIT I L n D n I D III I41jJ Z 2 _ ¢ ST FRANCISS'MRI EXHAUST FAN - 4 H VIRGINIA MASON FRANCISCAN HEALTH O - SITE r MacDonald -Miller PLAN W ISSUED FOR PERMIT F x gg F a HIM, � 5 s d � 3 I � rTIIm, n, �S:E — C� m Z o p vp esdso w � 13501350 x Boo/' I o A IR O Z II r1------------------T__, E N -�7 — - — - - 1 1€ _ �If m i1 •� m 12-8 o To = m 1a•a _ � <= o � � o mo I � _ g 41 - �... a -_- _ - _ - N, t g e m $ ST FRANCIS MRI EXHAUST FAN - - - i o m VIRGINIA MASON FRANCISCAN HEALTH - - � � o ^'a°°' _ _ MacDonald -Miller Oj u C � � N S � � �1r'/*\ r.'"' wwFA .v y.rw •� w.. ., r. t..«� m.. ISSUED FOR PERMIT ?I ; ¢ pi ST FRANCIS MRI EXHAUST FAN „IRGINIAMASON FRANCISCAN HEALTH v EOEPA WAY, WA9BOP3 9r n MacDonald -Miller tg HVAC ISSUED FOR PERMIT \ E ` . _ ! �| ) ofm k \ �� ; a /|\ { )R\s�v� EXHAUST HEALTH »m_&G_ _ , «ma HVAC---- ISSUED FOR PERMIT fill, III it Nil! it jq a m rn 'R. II �:AT 7T ro Qh u J11 4t if logti . 7�. ji�'l iSl 909 00000 (D@ aR ?c 'I'm if I, un;gxg IR 11 Jill '11� 7, il M -1c 10 KIM J -5dill !H'A ST. FRANCIS HOSPITAL •CALLISON P. OLITPAYIENT IMAGING TJ. St F—d. H—plial Federal Way, Washington aetaisaaa 34644 r-rQW61"I" .111 neetol 1 zoe s24 — Permit Number r 6938527-ME 111 M M FS#77221355 APN #: DVO067736 CITY, OF SEATTLE Mechanical Permit Site Address: 50017TH AVE SEATTLE, WA 98122 Building ID: Location: LEVEL A Seattle Department of Construction and Inspections 700 Fifth Ave, Suite 2000 PO Box 34019 Seattle, WA 98124-4019 (206) 684-8600 Legal Description: PARCELS A-F, LBA #3003656 REC NO. 20061101900006 TGW PARCEL C OF LBA Records Filed At: 500 17TH AVE APPLICANT MACDONALD MILLER PO BOX 47983 SEATTLE, WA 98146 Ph: (206) 768-4062 Primary Applicant/Installer CONTRACTOR MACDONALD MILLER PO BOX 47983 SEATTLE, WA 98146 Ph: (206) 768-4062 General Contractor Lic: MACDOFS8080S Application Date: 12/22/2022 Issue Date: 02/13/2023 Expiration Date: 08/13/2024 Fees Paid: $824.29 As of Print Date: 2/13/2023 Description of Work: MODIFY EXISTING PIPING TO ACCOMMODATE EQUIPMENT REPLACEMENT. per plans Permit Remarks: PERMIT SUBMITTED ONLINE NOTE: HEAT PUMPS, SPLIT SYSTEMS, AND A/C REQUIRE A SEPARATE REFRIGERATION PERMIT SDCI Valuation: 18500 Special Inspections: N Toning/Overlays: Land Use Conditions: N MIO-105-LR3 (M) MIO-160-LR3 (M) MIO-65-LR3 (M) FREQ_TRANSIT _SRVC_CORRIDOR Yes Additional Information on File A/P # Related Cases/Permits 6938527-ME-001 Contractor Disclosure Form 6938527-ME-002 Application Intake 6938527-ME-003 Upload Documents Project Contacts Name Phone Ordinance Reviewer NA NA Structural Reviewer NA NA NOTE: All components external to the building must comply with Seattle Noise Ordinances SMC 25.08.410 and 25.08.420. (Reference information at: www.seattle.gov/dpd/codesrules/commonquestions/noise/) Applicant Signature: Date: Permitted work must not progress without prior inspection approval. When ready for inspection, make request with the Seattle Department of Construction and Inspections at (206) 684-8900 or on the internet at: www.scattic.gov/dpd/permits/inspectionsl. Provide the permit number, site address, and contact phone. Permission is given to do the above work at the site address shown, according to the conditions hereon and according to the specification pertaining thereto, subject to compliance with the Ordinances of the City of Seattle. Correct information is the responsibility of the applicant. Permits with incorrect information may be subject to additional fees. You Must Have a Paper Copy of Your Approved and Stamped Plan Set Available at Your Job Site for the City Inspector to Review. If You Do Not Have Your Plans Printed and Ready for Review, You May Fail Your Inspection. City of .Seattle Seattle Department of Construction and Inspections PERMIT # 6938527-M E 700 Fifth Ave, Suite 2000 POST THIS SIDE OUT: TO THE CONTRACTOR/OWNER, Additional permits may be required for work occurring under this permit. This permit does not authorize Sewer, Public Right -of -Way Shoring, Drainage and Street Use, Fire Department, Boiler, Electrical, Elevator, Furnace, Gas Piping, Plumbing, or Sign permits. If other permits are required, they must be applied for separately from this permit. The requirements for all other permits related to this Permit, must be completed prior to the Final Inspection of this permit. This Permits Final Inspection is_required. The premises must not be occupied until the Final Inspection is provided and occupancy is authorized by the Seattle Department of Construction and Inspections. ISSUED PERMIT STATUS: You can check the status of issued permits on the internet at: www.seggle.gov/did INSPECTION REQUESTS: Please clarify which inspections your project requires before proceeding with your project. You may request an inspection on the internet or by phone. Inspection requests received before 7:00 AM are scheduled for the same working day. Inspection requests received after 7.00 AM are scheduled for the next working day. Inspectors are available between the hours of 7:30 AM and 8:30 AM. A) Internet: www.seattle.gov/dpd/permits/inspections/ Under Scheduling an Inspection click Requesting an inspection online. B) 24 hour inspection request line at (206) 684-8900, cell phones are discouraged due to frequent connection problems. C) Customer Service at (206) 684-8950 between the hours of 7:30 AM and 4:30 PM. FIRST GROUND DISTURBANCE: A) Before First Ground Disturbance, request an inspection of installed Erosion Control Measures. B) When required, request a Pre Construction Conference to review project conditions and Special Inspections by calling (206) 684-8860. C) If this permit requires a Soil Bearing Capacity special inspection by a Geotechnical Engineer, that approval is required before the foundation pour. The Building Inspector will accept the Geotechnical Engineer's approval signature below. D) When Special Inspections are required, notify the Special Inspection Agency at least 24 hours in advance.